Skip to content

Iteration Plan for September 2025Β #266653

Description

@kieferrm

This plan captures our work in September 2025. This is a 4-week iteration. We will ship in early October. It is a continuation of the August plan without any additions. Although a 4-week iteration, we'll have only 1 dev week. The second week is reserved for planning and engineering conversations.

Endgame

  • September 29, 2025: Endgame begins
  • October 3, 2025: Endgame done

The endgame details for this iteration are tracked here.

Plan Items

Below is a summary of the top level plan items.

Legend of annotations:

Mark Description
πŸƒ work in progress
βœ‹ blocked task
πŸ’ͺ stretch goal for this iteration
πŸ”΄ missing issue reference
πŸ”΅ more investigation required to remove uncertainty
⚫ under discussion within the team
⬛ a large work item, larger than one iteration

Accessibility

Code Editor

Source Control

Settings

Languages

Python

Terminal

Tasks

API

AI

MCP

Prompt, Instruction and Mode Files

Chat

Tools and tools management

Terminal/task tools

NES / Completions

Integrations

Engineering

Documentation

Website

  • None

Deferred

Metadata

Metadata

Labels

iteration-planVS Code - Upcoming iteration plan

Type

No type

Projects

No projects

Relationships

None yet

Development

No branches or pull requests

Issue actions